{"id":1460,"date":"2023-08-04T13:09:27","date_gmt":"2023-08-04T11:09:27","guid":{"rendered":"https:\/\/opm.lorenzundfuchs.de\/blog\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/"},"modified":"2023-11-07T13:14:24","modified_gmt":"2023-11-07T12:14:24","slug":"lufthansa-technik-ag-conversion-of-the-engine-workshop","status":"publish","type":"projekte","link":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/","title":{"rendered":"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP"},"content":{"rendered":"<div class=\"gb-grid-wrapper gb-grid-wrapper-4c0a93c0\">\n<div class=\"gb-grid-column gb-grid-column-f10fcbc8\"><div class=\"gb-container gb-container-f10fcbc8\">\n\n<p>At the Hamburg site, the overhaul center for CFM56 aircraft engines was completed. After relocating part of the production to the new building, it was now necessary to adapt the existing buildings to the requirements of state-of-the-art production methods. <\/p>\n\n\n\n<p><strong>This time, OPM managed a project where the structural framework was provided by the existing buildings:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Creation of user requirements with our URS requirements methodology<\/li>\n\n\n\n<li>Project management (\u00a731 HOAI LP 1-5) for buildings and facilities<\/li>\n\n\n\n<li>Refurbishment and relocation concepts during ongoing operation<\/li>\n\n\n\n<li>Integration of fire protection and safety concepts<\/li>\n\n\n\n<li>Legal project management Support in the coordination of individual trades (no general contractor)<\/li>\n<\/ul>\n\n\n\n<p>The focus was on the renovation of the building&#8217;s technical systems and the construction of new air-conditioning cabins with increased requirements for workplaces and machines. Another focus of the refurbishment measures was the fire protection upgrade of the hall and the adjacent office and workshop wings. The refurbishment was carried out during ongoing operations, a challenge for all involved, which was ensured by an intensive conception and planning phase. A project without laying the foundation stone, topping-out ceremony or inauguration ceremony. A refurbishment with the aim of combining the old building stock and the sub-areas to be refurbished into a functional overall unit.    <\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-c09ca549\"><div class=\"gb-container gb-container-c09ca549\">\n\n<p><strong>Facts and Figures<\/strong><\/p>\n\n\n\n<p><strong>Duration:<\/strong> 12\/2008-05\/2011<\/p>\n\n\n\n<p><strong>Client:<\/strong> Lufthansa Technik AG<\/p>\n\n\n\n<p><strong>Location:<\/strong> Hamburg, Deutschland<\/p>\n\n\n\n<p><strong>BGF:<\/strong> 37.500 m\u00b2<\/p>\n\n\n\n<p><strong>Investment:<\/strong> 8,1 Mio. Euro netto<\/p>\n\n\n\n<p><strong>Services<\/strong>: Basic and conceptual design, URS, project management construction and machinery<\/p>\n\n<\/div><\/div>\n<\/div>","protected":false},"featured_media":1281,"template":"","referenz":[],"class_list":["post-1460","projekte","type-projekte","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/\" \/>\n<meta property=\"og:site_name\" content=\"Otte Projektmanagement GmbH\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-07T12:14:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/08\/ref_08_02-copy.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/\",\"url\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/\",\"name\":\"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.otte-pm.net\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ref_08_02-copy.jpg\",\"datePublished\":\"2023-08-04T11:09:27+00:00\",\"dateModified\":\"2023-11-07T12:14:24+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/projekte\\\/lufthansa-technik-ag-conversion-of-the-engine-workshop\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.otte-pm.net\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ref_08_02-copy.jpg\",\"contentUrl\":\"https:\\\/\\\/www.otte-pm.net\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ref_08_02-copy.jpg\",\"width\":1920,\"height\":600,\"caption\":\"LUFTHANSA TECHNIK AG UMBAU DER TRIEBWERKSWERKSTATT\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/\",\"name\":\"Otte Projektmanagement GmbH\",\"description\":\"DEVELOPING COMPLEX PROJECTS TOGETHER\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#organization\",\"name\":\"Otte Projektmanagement GmbH\",\"url\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.otte-pm.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/opm_700.png\",\"contentUrl\":\"https:\\\/\\\/www.otte-pm.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/opm_700.png\",\"width\":700,\"height\":191,\"caption\":\"Otte Projektmanagement GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.otte-pm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/","og_locale":"en_US","og_type":"article","og_title":"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH","og_url":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/","og_site_name":"Otte Projektmanagement GmbH","article_modified_time":"2023-11-07T12:14:24+00:00","og_image":[{"width":1920,"height":600,"url":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/08\/ref_08_02-copy.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/","url":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/","name":"LUFTHANSA TECHNIK AG CONVERSION OF THE ENGINE WORKSHOP - Otte Projektmanagement GmbH","isPartOf":{"@id":"https:\/\/www.otte-pm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/#primaryimage"},"image":{"@id":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/#primaryimage"},"thumbnailUrl":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/08\/ref_08_02-copy.jpg","datePublished":"2023-08-04T11:09:27+00:00","dateModified":"2023-11-07T12:14:24+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.otte-pm.net\/en\/projekte\/lufthansa-technik-ag-conversion-of-the-engine-workshop\/#primaryimage","url":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/08\/ref_08_02-copy.jpg","contentUrl":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/08\/ref_08_02-copy.jpg","width":1920,"height":600,"caption":"LUFTHANSA TECHNIK AG UMBAU DER TRIEBWERKSWERKSTATT"},{"@type":"WebSite","@id":"https:\/\/www.otte-pm.net\/en\/#website","url":"https:\/\/www.otte-pm.net\/en\/","name":"Otte Projektmanagement GmbH","description":"DEVELOPING COMPLEX PROJECTS TOGETHER","publisher":{"@id":"https:\/\/www.otte-pm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.otte-pm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.otte-pm.net\/en\/#organization","name":"Otte Projektmanagement GmbH","url":"https:\/\/www.otte-pm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.otte-pm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/10\/opm_700.png","contentUrl":"https:\/\/www.otte-pm.net\/wp-content\/uploads\/2023\/10\/opm_700.png","width":700,"height":191,"caption":"Otte Projektmanagement GmbH"},"image":{"@id":"https:\/\/www.otte-pm.net\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/projekte\/1460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/projekte"}],"about":[{"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/types\/projekte"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/media\/1281"}],"wp:attachment":[{"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/media?parent=1460"}],"wp:term":[{"taxonomy":"referenz","embeddable":true,"href":"https:\/\/www.otte-pm.net\/en\/wp-json\/wp\/v2\/referenz?post=1460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}